Ridge HVAC — condenser swap
CALC • open
- Bid
- $2,480
- Actual cost
- $1,610
- Margin
- $870
- Margin %
- 35%
Labor $630.00 at $90.00/hr
Bid, materials, hours, and a burdened rate. The scorecard updates as you type. Nothing is saved on a server. No email required.
CALC • open
Labor $630.00 at $90.00/hr
Actual cost = materials + (hours × burdened labor rate). Margin dollars = bid − actual cost. Margin percent = margin dollars ÷ bid. If you only have a wage, load it first on the labor burden calculator.
This is a sketch. CostPerJob keeps bid + costs on the job scorecard.